Efficiency of Rajat = 9100​=11.11%Efficiency of Atul = 12100​=8.33%→ They do (11.11 + 8.33) % = 19.44% is 2 days∴ They need 10 days to do 97.20% of work Now the rest work (100 - 97.22 = 2.78% ) was done by Rajat =11.112.78​=41​ day∴ Total no. of days required to complete the whole work = 10+41​=1041​days