- (ii) But time taken by R = 1.25 × time taken by Q i.e.
1
Q
+
1
R
=
1.25
R
+
1
R
=
2.25
R
- (iii) Solving eq. (i), (ii) and (iii) we get, Time taken by P to complete the whole work alone = 18 days And that by Q = 24 days and by R= 30 days Req. answer =