DIRECTIONS (Qs. 136-140): Go through the pie chart/s given below and answer the question that follows.
The distribution of construction of Solar Power Plant (S.P.P.) in the world in 2024 and the cost incurred in building and maintaining these Solar Power Plants (S.P.P.) in 2024 was tabulated countrywise and drawn in the pie chart.
Total cost incurred in constructing and maintaining (S.P.P) in world in 2024 = $3500 million