60% work ≡ 15 days∴ 100% work ≡6015×100​=25days⇒ A alone can do the work in 25 daysRemaining work = 40% =52​Let B alone do the work in x days.
⇒5(251​+x1​)=52​⇒x1​=252​−251​=251​⇒x=25 days
AliterRemaining 40 % work is done by A + B in 5 days∴ A + B will do 60% work in 405×60​=215​A alone does 60% work in 15 days⇒ A and B are equally efficient∴ Time taken by B or A alone to do 100% work =60.15×100​=25days